The San Francisco-Oakland Bay Bridge will be closed indefinitely while crews repair an upper-deck cable that snapped during rush-hour on Tuesday evening. According to the AP, the broken cable and a chunk of bridge metal fell onto the westbound lanes, damaging at least one vehicle.
The cable that snapped was put in last month to repair a crack that was discovered over Labor Day weekend. While the issue is repaired, other forms of transportation will double up their efforts to keep people moving on trains and ferries.
The snapped wire could be a sign of more repair work to come, though. As quoted in the Los Angeles Daily News, a civil engineering professor at UCLA Berkeley called the initial crack a “warning sign” of more problems. He said the repair was really just a Band-Aid and “demonstrates the need for a longer-term solution.” The bridge is 73 years old and carries around 260,000 people each day.